AIR EMISSIONS FEES; SUNSET EXTENSION                                                     S.B. 530:

                                                                                 SUMMARY OF INTRODUCED BILL

                                                                                                         IN COMMITTEE

 

 

 

 

 

 

 

 

 

Senate Bill 530 (as introduced 9-17-19)

Sponsor:  Senator Rosemary Bayer

House Committee:  Appropriations

Senate Committee:  Appropriations

 

Date Completed:  9-17-19

 


CONTENT

 

The bill would amend Part 55 (Air Pollution Control) of the Natural Resources and Environmental Protection Act, the statutory basis for the Department of Environment, Great Lakes, and Energy (EGLE) Air Quality Division's Renewable Operating Permit (ROP) program. The bill would extend the sunset on the ROP program fees for four years, from October 1, 2019, to October 1, 2023.

 

The bill also would adjust and increase annual ROP fees and create a new categorical fee structure. These changes are detailed in the FISCAL IMPACT section below.

 

MCL 324.55201 &324.5522                                                                                       

 

BACKGROUND

 

Under Title V of the Federal Clean Air Act (CAA), states are required to operate a permitting program for facilities that are major sources of air pollution within their respective states. EGLE's ROP program is Michigan's program under Title V.

 

Approximately 850 large Michigan facilities pay ROP fees under the ROP program. These facilities include manufacturing facilities, electric and steam generation plants, mining and processing facilities, chemical manufacturers, and others. The fees these facilities pay are based primarily on the amount of hazardous air pollutants (HAPs) released annually by those facilities. Additionally, approximately 520 smaller facilities pay a flat $250 fee; most of these facilities are dry cleaners and parts degreasing shops.

 

Fees are assessed by the tonnage of HAPs released by a facility on an annual basis. Permits fall into three broad categories based on HAP tonnage.

 

·         Category I: Facilities that are capable of releasing 100 tons or more of HAPs per year.

·         Category II: Facilities that are capable of releasing 10 tons or more of any single HAP, or 25 tons or more of HAPs in aggregate.

·         Category III: Not considered a "major source" of air pollution by the Environmental Protection Act (EPA) (these facilities are mainly dry cleaners and parts degreasing facilities).

 

 

 

 

 

 

FISCAL IMPACT

 

Currently, all Category I and II facilities that are not municipal electricity generating facilities pay a base annual facility charge as well as a per-ton charge. Per-ton charges are capped so that after reaching a level of emissions, EGLE cannot bill for further emissions. It should be noted that this is not a cap on emissions; it is a cap on billing. Category III facilities are charged a $250 facility charge and no per-ton rate.

 

Under the bill, the current three-tiered categorical fee structure would become six-tiered, shown in Table 1. Category A, B, C, and D facilities would pay an increased base annual facility charge as well as an increased per-ton charge. Category E and F facilities would pay a base annual facility charge and no per-ton charge.

 

Table 1

Current Fee Categories:

Fee Categories Under S.B. 530

Category I

Category A - Electric Providers

Category B - Nonelectric Providers

Category II

Category C - Major Hazardous Air Pollutants

Category D - New Source Performance Standards

Category E - Title V Opt-Out Permit

Category III

Category F - Not considered "major source"

 

Table 2 below shows the current fee structure for facilities that are not municipal electric- generating facilities. Table 3 shows how these fees would change under the bill.

 

Table 2

Current Fees:

Nonmunicipal Facilities

Facility Type

Facility Charge

Charge Per Ton

Billing Cap (tons)

Maximum Fee

Category I: Nonelectric generating facility

$5,250

$51.15

1,250 per pollutant, 4,500 total

$235,425

Category I: Electric generating facility

$5,250

$51.15

1,500 per pollutant, 6,100 total

$317,265

Category II: Nonelectric generating facility

$1,795

$51.15

1,250 per pollutant, 4,500 total*

$6,910*

Category II: Electric generating facility

$1,795

$51.15

1,500 per pollutant, 6,100 total*

$6,910*

Category III

$250

N/A

N/A

$250

* While the bill does not provide an explicit tonnage cap on billings for Category II facilities, it is likely that a Category II facility with an ROP fee higher than $6,590 (meaning it had emissions higher than 100 tons) would be categorized as a Category I facility.

 

 

 

 

 

 

 

 


 

 

Table 3

Proposed Fees Under S.B. 530:

Nonmunicipal Facilities

Facility Type

Facility Charge

Charge Per Ton

Billing Cap (tons)

Maximum Fee

Category A

$5,250 -$45,000

$53.00

1,500 per pollutant, 6,100 total

$368,300

Category B

$5,250 - $21,000

$53.00

1,250 per pollutant, 4,500 total

$259,500

Category C

$2,500 -$4,500

$53.00

1,250 per pollutant, 4,500 total

$243,000

Category D

$1,795 -$2,500

$53.00

1,250 per pollutant, 4,500 total

$241,000

Category E

$250 - $1,795

N/A

N/A

$1,795

Category F         

$250

N/A

N/A

$250

 

Under current law, municipal electric generating facilities with emissions over 730 tons have a different fee structure than other regulated facilities. Tables 4 and 5 show how those fees exist in current law and would be changed under the bill, respectively.

 

Table 4

Current Fees: Municipal Electric Generating Facilities

Emission Level

Fee

0 – 730 tons

$5,250 plus $51.15 per ton (same as equivalent Category I facility)

731 – 5,000 tons

$41,830

5,000 and greater

$5,250 plus $51.15 per ton (same as equivalent Category I facility)

 

Table 5

Fees Under S.B. 530: Municipal Electric Generating Facilities

Emission Level

Fee

0 – 646 tons

$5,250 - $21,000 plus $53.00 per ton (same as equivalent Category B facility)

646 tons and greater

$50,000

 

In FY 2018-19, the total revenue collected under the ROP program was $9.6 million. Under the bill, collections for FY 2019-20 likely would increase to $10.0 million, an increase of $400,000 over FY 2018-19 collections. The fiscal year 2019-20 EGLE budget as approved in Senate Bill 137 (S-2) CR-1 included an additional $2.0 million GF/GP increase to the EGLE ROP program to address increasing program costs. The anticipated total revenue for the ROP program under the bill, including the additional $2.0 million, would be approximately $12.0 million on an annual basis.

 

                                                                                     Fiscal Analyst:  Abbey Frazier

 

 

This analysis was prepared by nonpartisan Senate staff for use by the Senate in its deliberations and does not constitute an official statement of legislative intent.